Fall 2011
-
Fall at Pensmore™
-
Reclaiming the Past
Close to the site of the chateau, we plan to use the wood from this original structure, said to have once been used as a saw mill, for some of our interior features.
-
Where We are Today
This gallery starts with exterior photos, leads you through some of the rooms inside, and ends at the top level where we are working today.
-
Rear Elevation, Guest Wing
guest wing roof is near completion and windows are scheduled to be installed next month
-
Tower Roof
a crane is used to lift a steep roof section into place, making it safer for the crew
-
Roofing
steel reinforcement for roof structure
-
-
-
-
-
-
-
-
-
Turret
-
-
THEN
Fall 2010
-
THEN
Fall 2010
-
NOW
Fall brings us to another level finished
-
-
-
-
-
ENTER
a look at the front entrance before we enter the chateau
-
Rotunda
looking down through the rotunda
-
Rotunda
looking up through the rotunda; the plan is to cap the rotunda with an interior dome
-
Inside Pensmore™
Interiors finish phase is beginning this fall
-
Great Hall
-
Joists
joists for the next floor up
-
-
Stairwell
stairs, and an elevator shaft for future use, take us up to the top level where we are working today
-
Top Level
a view of the joists
-
Top Level
taking in the sights of Fall in the Ozarks
-
-
-
Top Level
the view toward the guest wing