Stage 1: Foundation

  • Aerial View
  • PageImage-491042-2136985-100_2855.jpg
  • At the Pensmore Site
  • Drain Field
  • PageImage-491042-2136983-Picture157.jpg
  • PageImage-491042-2136981-Picture161.jpg
  • PageImage-491042-2136980-Picture160.jpg
  • PageImage-491042-2136984-Picture159.jpg
  • Site Excavation
  • Site Excavation
  • First Pour of Concrete
  • PageImage-491042-2123102-PouringFoundationFloor2.JPG
  • Aerial View

    Aerial View

    House site before the excavation

  • PageImage-491042-2136985-100_2855.jpg
  • At the Pensmore Site

    At the Pensmore Site

    Lush and green; we want to keep it that way.

  • Drain Field

    Drain Field

    Supplies for the drain field arrive.

  • PageImage-491042-2136983-Picture157.jpg
  • PageImage-491042-2136981-Picture161.jpg
  • PageImage-491042-2136980-Picture160.jpg
  • PageImage-491042-2136984-Picture159.jpg
  • Site Excavation

    Site Excavation

    Excavation: 2009

  • Site Excavation

    Site Excavation

    Excavation completed

  • First Pour of Concrete

    First Pour of Concrete

    Foundation being poured

  • PageImage-491042-2123102-PouringFoundationFloor2.JPG

    Foundation work